We carried out safety barrier works on the A9 Dalraddy phase of the A9 dualling project for Will Bros and John Paul who were carrying out the main contractor works as a joint venture.
Around 20km of new safety barrier systems were installed.
Works included:
- Centre reserve and verge barrier works with Flexbeam
- Wire rope systems and all associated transitions and terminals
- Location
Kincraig to Dalraddy
- Client
Wills Bros John Paul JV
- Date
September 2016