We carried out fencing (temporary and permanent) and permanent barrier works for Morgan Sindall as part of a new intersection and slip roads off of the M8 at Bishopton. Works included the following:
Temporary Fencing – Approximately 2,000m (plus gates)
Permanent Fencing – Approximately 5,000m (plus gates)
Permanent Barrier Works – Approximately 4,000m (plus terminals and transitions)
The works also included the bespoke design and manufacture of parapet connections to an existing structure over the M8.
These works were completed successfully in December 2019.
- LocationM8 Near Bishopton
- ClientMorgan Sindall
- DateMarch 2017